Practical ideas from FARM SHOW MagazineSubscribe · Free issue · Send us your shop tip
Subscribe to FARM SHOW
Home / Vol. 20, No. 2 (1996)

Don Tupper

Don Tupper, Monroe, Wis.
Don Tupper
Photo: FARM SHOW · Vol. 20, No. 2 (1996) · p. 30

Don used to get false readings when using his long level on stud walls until he made this level holder. The problem was finding a way to get an accurate reading even off a bowed stud. His holder only makes contact at the top and bottom of the wall stud. He made the holder by ripping a 7-in. wide sheet of 3/4-in. plywood. Then he cut out a section along one side that’s 1/4 in. wider than his level. He made 45° cuts on either end to leave a small, flat point to rest on the floor. A hand hold near the center of the holder makes it easy to carry and hold in place. Four strips of duct tape hold the level in place.

Reproduced from the published FARM SHOW entry. Prices, coupons, availability and contact details are historical, not current offers. Reader methods are not universal instructions: follow manufacturer guidance, proper supports and safety practices, and consult a qualified professional when needed.

Comments and votes

Have you tried this idea? Mark it helpful and share how it worked in your shop.